- Includes all hardware, straps, etc. needed for set-up at to begin using. (Pulley systems are sold seperately)
- All rigs can be set up to any of the lower heights.
- Powdercoating offers weather resistance
- Ship weight is about 180 lbs.
Custom, handcrafted portable aerial quad rig! This aerial rig is powdercoated to the color of your choosing and made from structural steel!
-This aerial quad rig is able to be set up at multiple elevations to a maximum of approximately 15 ft!
-Set up at lower heights of 6 and 11 feet as well. Able to be adjusted in 6 inch increments anywehre under 15ft and lower.
-The adjustable feet allow the footprint to be adjusted to keep the rig level depending on where you set it up and if on unlevel ground!
-This aerial QUAD comes with one rigging point but there a multiple other holes which allow additional attachments for pulley system and other apparatuses. All hardware needed to get started immediately comes with, other than pulley system. Just attach your aerial silk, lyra or other aerial apparatus and begin training or performing right away!
-These aerial rigs are fully portable, fit in most vehicles and are designed to be set up and broken down relatively quickly.
Additional eye hooks sold separately!!
This aerial rig comes standard in a hammered black powder coated texture paint!
The aerial rig is weather resistant!
SPECS
11-15 ft Quad Rig
Static load, safe working load= 400 lbs
Dynamic load, safe working load (force with drop load) = 1200 lbs
Rolls, short bomb drops, soft drops are okay.
We do not advise to do big drops that generate very high shock loads, like long bomb drops.
Estimated BREAKING LOAD approximately 2000 lbs
Footprint at full 15′ height, about 14′ x 17′
NEVER do DROPS with 2 people on the rig.
NEVER have 2 people on a rig set up to over 20 ft. high.
We ship within the Continental United states. We do not ship to Alaska or Hawaii.
These rigs are not usually kept in stock, unless you order black you may get lucky. All of our rigs are normally made to order. The process takes 3-6 weeks start to finish and sometimes a bit less sometimes a bit more.
Feel free to message us any questions!
Reviews
There are no reviews yet.